I need help hooking up a Hallman MBC to a HKS GT wategate. The GT has two nipples on it. Lets refer to the one closest to the adjustment screw as the bottom one and the one above that as the top. Which nipple do you run a T to and T pressure source into the MBC and back out? What do you do with the other nipple when hooking up a MBC?
Thanks
Josh
Thanks
Josh